Basic Info.
After-sales Service
Site Service, Supervision, etc.
LNG Output
2tph, 3tph, 5tph
Process Selection
S-Mrc, D-Mrc, C3-Mrc
Transport Package
Seaworthy Packing
Specification
As required
Product Description
About Us
Greenfir is a professional natural gas processing & liquefaction plant, air separation unit, heat exchanger, reciprocating piston compressor, cryogenic cold box, fractionating column manufacturer and solutions provider with ISO 9001: 2015, ISO 14001: 2015, ISO 45001: 2018 and ASME U certified.
We offer skid-mounted solutions optimized for each specific project, covering the following applications: Air Separation Plant, LNG Plant, Gas Purification & Liquefaction Unit, CNG/ LNG/ L-CNG Filling Station, Flare Gas Recovery Unit and Hydrogen Purification Unit, etc. We can deliver skid-mounted solutions customized to meet client's challenges and requirements (including adverse weather conditions, transportation and plot area limitations, etc).
We treat all the cryogenic solutions with serious attitudes and professional experience. Combined with our knowledge and experience, Greenfir provides each client with a technology-leading solution you can count on and bring a wider range of options and more profits.
Product Description
To Meet Demand, Gas Processors Need the Right Solution
Much of the world's gas reserves are located in remote, hard-to-reach
locations, requiring solutions that can be applied in varying conditions.
Meanwhile, gas developers need to be able to predict and control capital
spending, while maximizing the value of their natural gas and natural gas
liquids (NGLs). The solution: modular equipment.
Modular Equipment -The Solution for Gas Processing
Greenfir provides solutions for your gas processing project, including shop
fabrication, construction management, startup, and operations. We
offer a range of solutions to best meet your gas processing needs - from
straightforward dew pointing operations, to maximum NGL recovery.
Modular Design for Reduced Costs and Predictable Timelines
Our modular gas processing plants are factory-built using a unique design
and construction approach that allows for quick fabrication and superior
quality control. Due to pre-fabricated construction, your plant can be
shipped by truck - even to remote locations. Upon delivery to a prepared
worksite, the equipment is ready to install. Modules are designed to fit
together rapidly, significantly reducing site construction time, expense and
associated delays.
The following modular gas processing plant components are available from Greenfir, Acid Gas Treatment, Dehydration, Mecury Removal, NGL Recovery, NGL Fractionation and Sulfur Recovery.
Process Technology
Greenfir liquefaction technologies are mostly based on the MR (mixed refrigerant) technology. It is designed with a closed loop refrigerant cycle, thereby eliminating make-up or chemical/ logistics handling for the refrigerant. The main elements of the plant are as listed below, while different modules can be incorporated to improve the efficiency of the plant according to the specific project requirements.
Main System- Filtering & Metering Skid
- Gas Purification System (Acid Gas Removal package, Dehydration Package, and Mercury Removal Package)
- Liquefaction (Cold Box, MR Compressor, etc.)
- LNG Storage
- LNG Loading System
- Utilities (Instrument Air & PSA Nitrogen Generattion Package, Demineralized Water System, Hot Transfer Oil System)
- Instrumentation Control System
- Electrical Control System
- Feed Gas Booster Compressor(s) (Optional)
- Nitrogen Removal Column (Optional)
- Heavy Hydrocarbons Separation (Optional)
- Biol-off Gas Handling (BOG Compressor) (Optional)
- Power Generation (Optional)
- etc.
Customer Benefits
- Robust and reliable technology that is simple to operate.
- Designed for unmanned operation.
- Easy start-up and shut down of all systems.
- Quick and easy capacity control.
- Compact and modularized design ensures easy shipment and cheaper installation.
- The lowest specific power consumption in small size plants.
- All components based on conventional parts and proven technology -> Spares can be delivered quickly.
- Reliable main rotating machinery with high efficiency.
- Local control of LNG export -> truck driver handles the loading.
- Fast project delivery time (FOB 7 months for the MRC Process).
- Broad range of applications, biogas, pipeline, CBM and associated gas
Our extensive service offerings, coupled with our unmatched technical knowledge and experience, can help you focus on profitability.
Reference List
Project | Scope of Supply | Capacity | Quantity | Location | Year |
Natural Gas Purification, Liquefaction Plant |
50,000 Nm3/day Wellhead Gas Recovery Project | EPC | | 1 | China | Nov. 2016 |
30,000 Nm3/day Mini LNG Plant | EPC | | 2 | China | May, 2017 |
30,000 Nm3/day Wellhead Gas Recovery Project | EPC | | 1 | China | May, 2017 |
30,000 Nm3/day Mini LNG Plant | EPC | | 1 | China | Nov. 2018 |
50,000 Nm3/day Wellhead Gas Recovery Project | EPC | | 1 | China | Nov. 2019 |
60,000 Nm3/day Mini LNG Plant | EPC | | 1 | China | Nov. 2018 |
Demethanizer and Deethanizer Rectification System | EP | 20,000 Nm3/day | | Kazakhstan | Jul. 2020 |
CNPC 100,000 Nm3/h Mini LNG Plant | EPC | | 2 | China | Jan. 2021 |
ARV 50 TPD Mini LNG Plant Project | EP, Supervision Commissioning, Start-up | 50 TPD | 1 | Irian | Apr. 2021 |
MAN 3.5 MMSCFD Mini LNG Plant Project | EP, Supervision Commissioning, Start-up | 3.5 MMSCFD | 1 | Irian | Apr. 2021 |
50,000 Nm3/day Mini LNG Plant | EPC | | 1 | China | Aug. 2021 |
Ethylene Compressor Station | EP, Supervision Commissioning, Start-up | 17.88 MMSCFD | | Irian | Apr. 2022 |
MAR 20 MMSCFD Amine Sweetening Package Project | EP, Supervision Commissioning, Start-up | 20 MMSCFD | 1 | Irian | Dec. 2022 |
KHE 13 MMSCFD Field Flare Gas Recovery Project | EP, Supervision Commissioning, Start-up | 13 MMSCFD | 1 | Irian | Dec. 2022 |
100,000 Nm3/h Mini LNG Plant | EPC | | 2 | China | Dec 2022 |
Deethanizer Rectification System | EP | 30,000 Nm3/day | 1 | Kazakhstan | Mar. 2023 |
220,000 Nm3/day (0.05 MTPA) small-scale LNG plant | EPC (in progress) | | 1 | China | 2023 |
300,000 Nm3/day small-scale LNG plant | EPC (in progress) | | 1 | China | 2023 |
Xinjiang 300,000 Nm3/day small-scale LNG plant | EPC (in progress) | | 1 | China | 2023 |
Location: Qingyang City, Gansu, China
Feed gas capacity: 30,000 Nm3/day @ 4 barg
Plant turndown ratio: 30~110%
Process plant: include amine sweetening package, dehydration package, Hg removal, HHC removal, utilities, LNG truck loading facilities, etc.
Product: LNG = 21 TPD.
Location: Qingyang City, Gansu, China
Feed gas capacity: 50,000 Nm3/day @ 4 barg
Plant turndown ratio: 30~110%
Process plant: include feed gas booster compressors (1W+1S), amine sweetening package, dehydration package, Hg removal, HHC removal, utilities, LNG truck loading facilities, etc.
Products: LNG = 25 TPD, LPG = 18 TPD.
Location: Mianyang City, Sichuan, China
Feed gas capacity: 240,000 Nm3/day @ 50 barg, appro. 20 °C.
Plant turndown ratio: 30~110%
Process plant: include gas generator units (2×3.75 mW), amine sweetening package, dehydration package, Hg removal, HHC removal, utilities, LNG truck loading facilities, etc.
Product: LNG = 2×72 TPD.
Feed gas capacity: 72,000 Nm3/day @ 30~60 barg, 15~30 °C.
Plant turndown ratio: 30~110%
Process plant: include amine sweetening package, dehydration package, Hg removal, HHC removal, nitrogen rejection, utilities, LNG truck loading facilities, LNG storage tank (2×500 square meter) etc.
Product: LNG = 50 TPD.
Location: Leshan City, Sichuan, China
Feed gas capacity: 100,000 Nm3/day @ 100 barg.
Plant turndown ratio: 30~110%
Process plant: include amine sweetening package, dehydration package, Hg removal, utilities, LNG truck loading facilities, etc.
Product: LNG = 72 TPD.
Location: Ziyang City, Sichuan, China
Feed gas capacity: 60,000 Nm3/day @ 40 barg, 15~30 °C.
Plant turndown ratio: 30~110%
Process plant: include amine sweetening package, dehydration package, Hg removal, utilities, LNG truck loading facilities, etc.
Product: LNG = 42 TPD.
FAQ
Q1. Are you manufacturer or trading company?
We are professional manufacturer of multi-components gas purification, separation and liquefaction equipment.
Q2. What's your advantage?
We provide you not only technology-leading, stable and reliable, cost-efficient equipment, but also solutions and after-sales services.
Q3. Have your engineers participated in any foreign projects?
Yes, our engineers have more than 20 years experience in our field and have participated in the design, manufacturing, installation and commissioning of the equipment in Turkey, Iran, Egypt, Nigeria, Russia, India, etc.
Q4. How can I get the exact price of the product?
Please tell us your specific requirements, so we can provide the most suitable products and solutions to you.
Address:
No. 16, Energy Saving Avenue, Huaikou Town, Jintang County, Chengdu, Sichuan, China
Business Type:
Manufacturer/Factory
Business Range:
Agriculture & Food, Chemicals, Electrical & Electronics, Health & Medicine, Industrial Equipment & Components, Instruments & Meters, Metallurgy, Mineral & Energy
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, ASME
Company Introduction:
GreenFir is an enterprise dedicated to the research and development of multi-component gas separation, purification and liquefaction, as well as the design and manufacture of core equipment. The company has obtained the U-stamp certification authorized by the American Society of Mechanical Engineers (ASME), and the domestic A1 and A2 design qualifications issued by the State Administration of Market Supervision and Administration, as well as the A2 equipment manufacturing qualification. GreenFir has a design center located in Jianyang; And two manufacturing bases are located in Chengdu and Ziyang, with a total area of 27000 square meters. The company pursues the values of "Always be honest, Continuous learning, Passion and boldness, Commitment to customers", and provides partners with technologies and products with stable operation, safety, reliability, and energy efficiency.