Basic Info.
After-sales Service
Site Service, Supervision, etc.
Dm Water Pacckage
Included
in Air and N2 Package
Included
Power Supply
Ng Generator Unit
Transport Package
Seaworthy Packing
Specification
As required
Product Description
About Us
Greenfir is a professional natural gas processing & liquefaction plant, air separation unit, heat exchanger, reciprocating piston compressor, cryogenic cold box, fractionating column manufacturer and solutions provider with ISO 9001: 2015, ISO 14001: 2015, ISO 45001: 2018 and ASME U certified.
We offer skid-mounted solutions optimized for each specific project, covering the following applications: Air Separation Plant, LNG Plant, Gas Purification & Liquefaction Unit, CNG/ LNG/ L-CNG Filling Station, Flare Gas Recovery Unit and Hydrogen Purification Unit, etc. We can deliver skid-mounted solutions customized to meet client's challenges and requirements (including adverse weather conditions, transportation and plot area limitations, etc).
We treat all the cryogenic solutions with serious attitudes and professional experience. Combined with our knowledge and experience, Greenfir provides each client with a technology-leading solution you can count on and bring a wider range of options and more profits.
Product Description
Mini and Small-Scale LNG (MSLNG & SSLNG) plant is the use of small liquefaction and regasification facilities that enable flexible supply chains to deliver to multiple smaller distributed users. These users would normally consume energy with short supply agreements, at lower quantities or in remote locations that would previously be unserved by conventional natural gas infrastructure.
Greenfir has years of valuable experience in developing liquefaction technology for small scale applications. We understand the importance of operational simplicity, flexibility, efficiency, equipment robustness, and a compact footprint when dealing with mini and small scale LNG projects.
Advancing technology is making even smaller units feasible and opening up new markets. LNG can be transported by road or train to be delivered into skid-mounted storage at the point of use, providing flexible and deployable energy at significantly reduced costs to the user.Process Technology
Greenfir liquefaction technologies are mostly based on the MR (mixed refrigerant) technology. It is designed with a closed loop refrigerant cycle, thereby eliminating make-up or chemical/ logistics handling for the refrigerant. The main elements of the plant are as listed below, while different modules can be incorporated to improve the efficiency of the plant according to the specific project requirements.
Main System- Filtering & Metering Skid
- Gas Purification System (Acid Gas Removal package, Dehydration Package, and Mercury Removal Package)
- Liquefaction (Cold Box, MR Compressor, etc.)
- LNG Storage
- LNG Loading System
- Utilities (Instrument Air & PSA Nitrogen Generattion Package, Demineralized Water System, Hot Transfer Oil System)
- Instrumentation Control System
- Electrical Control System
- Feed Gas Booster Compressor(s) (Optional)
- Nitrogen Removal Column (Optional)
- Heavy Hydrocarbons Separation (Optional)
- Biol-off Gas Handling (BOG Compressor) (Optional)
- Power Generation (Optional)
- etc.
Customer Benefits
- Robust and reliable technology that is simple to operate.
- Designed for unmanned operation.
- Easy start-up and shut down of all systems.
- Quick and easy capacity control.
- Compact and modularized design ensures easy shipment and cheaper installation.
- The lowest specific power consumption in small size plants.
- All components based on conventional parts and proven technology -> Spares can be delivered quickly.
- Reliable main rotating machinery with high efficiency.
- Local control of LNG export -> truck driver handles the loading.
- Fast project delivery time (FOB 7 months for the MRC Process).
- Broad range of applications, biogas, pipeline, CBM and associated gas
Reference List
Project | Scope of Supply | Capacity | Quantity | Location | Year |
Natural Gas Purification, Liquefaction Plant |
50,000 Nm3/day Wellhead Gas Recovery Project | EPC | | 1 | China | Nov. 2016 |
30,000 Nm3/day Mini LNG Plant | EPC | | 2 | China | May, 2017 |
30,000 Nm3/day Wellhead Gas Recovery Project | EPC | | 1 | China | May, 2017 |
30,000 Nm3/day Mini LNG Plant | EPC | | 1 | China | Nov. 2018 |
50,000 Nm3/day Wellhead Gas Recovery Project | EPC | | 1 | China | Nov. 2019 |
60,000 Nm3/day Mini LNG Plant | EPC | | 1 | China | Nov. 2018 |
Demethanizer and Deethanizer Rectification System | EP | 20,000 Nm3/day | | Kazakhstan | Jul. 2020 |
CNPC 100,000 Nm3/h Mini LNG Plant | EPC | | 2 | China | Jan. 2021 |
ARV 50 TPD Mini LNG Plant Project | EP, Supervision Commissioning & Start-up | 50 TPD | 1 | Irian | Apr. 2021 |
MAN 3.5 MMSCFD Mini LNG Plant Project | EP, Supervision Commissioning & Start-up | 3.5 MMSCFD | 1 | Irian | Apr. 2021 |
50,000 Nm3/day Mini LNG Plant | EPC | | 1 | China | Aug. 2021 |
Ethylene Compressor Station | EP, Supervision Commissioning & Start-up | 17.88 MMSCFD | | Irian | Apr. 2022 |
MAR 20 MMSCFD Amine Sweetening Package Project | EP, Supervision Commissioning & Start-up | 20 MMSCFD | 1 | Irian | Dec. 2022 |
KHE 13 MMSCFD Field Flare Gas Recovery Project | EP, Supervision Commissioning & Start-up | 13 MMSCFD | 1 | Irian | Dec. 2022 |
100,000 Nm3/h Mini LNG Plant | EPC | | 2 | China | Dec 2022 |
Deethanizer Rectification System | EP | 30,000 Nm3/day | 1 | Kazakhstan | Mar. 2023 |
Address:
No. 16, Energy Saving Avenue, Huaikou Town, Jintang County, Chengdu, Sichuan, China
Business Type:
Manufacturer/Factory
Business Range:
Agriculture & Food, Chemicals, Electrical & Electronics, Health & Medicine, Industrial Equipment & Components, Instruments & Meters, Metallurgy, Mineral & Energy
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, ASME
Company Introduction:
GreenFir is an enterprise dedicated to the research and development of multi-component gas separation, purification and liquefaction, as well as the design and manufacture of core equipment. The company has obtained the U-stamp certification authorized by the American Society of Mechanical Engineers (ASME), and the domestic A1 and A2 design qualifications issued by the State Administration of Market Supervision and Administration, as well as the A2 equipment manufacturing qualification. GreenFir has a design center located in Jianyang; And two manufacturing bases are located in Chengdu and Ziyang, with a total area of 27000 square meters. The company pursues the values of "Always be honest, Continuous learning, Passion and boldness, Commitment to customers", and provides partners with technologies and products with stable operation, safety, reliability, and energy efficiency.